← All projects
Project · Built example: full package
House with a knee wall and a pitched roof, 169.2 m²
Ordering this house is not open yet. View the sample package →
Sheets of this house
AR-13 · Axonometry south-east
AR-02 · Ground floor plan
AR-05 · Elevations north + east
AR-07 · Section A-A
Sample sheets marked DEMO. Not for execution.
The project in figures
- Gross floor area
- 169.2 m²
- Storeys
- 2
- Bedrooms
- 2
- Footprint
- 9 × 9.4 m
- Roof
- Pitched
Construction cost
Likely construction cost, excl. VAT
€350,000
Interval: €280,000 to €410,000
Incl. VAT: €340,000 to €500,000
The likely value from the estimate of this project, excl. VAT; the interval is the estimate's own.
The full cost estimate for the Netherlands, with price sources →
What is in the package
The sheets and documents of the built example, by section. Names come from its manifest.
93 of 94 sheets and documents are built; the example is checked automatically and not reviewed by a specialist.
- AR-01Site planA3 · 1:500
- AR-02Ground floor planA3 · 1:50
- AR-03First floor planA3 · 1:50
- AR-04Roof planA3 · 1:100
- AR-05Elevations north + eastA3 · 1:100
- AR-06Elevations south + westA3 · 1:100
- AR-07Section A-AA3 · 1:50
- AR-08Section B-BA3 · 1:50
- AR-09Details: foundation and floorA3 · 1:10
- AR-10Details: facadeA3 · 1:10
- AR-11Details: window framesA3 · 1:5
- AR-12Details: roofA3 · 1:10
- AR-13Axonometry south-eastA4
- AR-14Perspective south-east (schematic)A3
- AR-15Room schedule NEN 2580A4
- AR-16Window and frame scheduleA3
- AR-17Door scheduleA4
- AR-18Material scheduleA3
- AR-19Finishes scheduleA3
- AR-20Brick coursing and dimensionsA3 · 1:50
- AR-21Fire safetyA3 · 1:100
- AR-22Accessibility and Bbl checklistA4
- AR-23Details: interior and stairA3 · 1:10
- AR-24Open items registerA3
- AR-25Floor and ceiling plansA3 · 1:100
- AR-26Wet rooms, wall developmentsA3 · 1:50
- AR-27Stair, calculation and checkA3 · 1:25
- AR-28Wall junctionsA3 · 1:40
- AR-29Roof junctionsA3 · 1:40
- AR-30Foundation junctionsA3 · 1:40
Indicative, not for execution. Structural parts need the confirmation of a structural engineer.