Sample package

Sample package: a 128 m² house, 94 documents

Every sheet is marked DEMO and shown reduced. The paid package has no mark and the files come as PDF, DXF, XLSX and 3D.

Gross floor area
128 m² gross floor area
Storeys
2 storeys
Bedrooms
3 bedrooms
Size in plan
8.4 × 7.6 m in plan

Sections of the package: 11

ARArchitecture· 30

  • AR-01 · Site plan

  • AR-02 · Ground floor plan

  • AR-03 · First floor plan

  • AR-04 · Roof plan

  • AR-05 · Elevations north + east

  • AR-06 · Elevations south + west

  • AR-07 · Section A-A

  • AR-08 · Section B-B

  • AR-09 · Details: foundation and floor

  • AR-10 · Details: facade

  • AR-11 · Details: window frames

  • AR-12 · Details: roof

  • AR-13 · Axonometry south-east

  • AR-14 · Perspective south-east (schematic)

  • AR-15 · Room schedule NEN 2580

  • AR-16 · Window and frame schedule

  • AR-17 · Door schedule

  • AR-18 · Material schedule

  • AR-19 · Finishes schedule

  • AR-20 · Brick coursing and dimensions

  • AR-21 · Fire safety

  • AR-22 · Accessibility and Bbl checklist

  • AR-23 · Details: interior and stair

  • AR-24 · Open items register

  • AR-25 · Floor and ceiling plans

  • AR-26 · Wet rooms, wall developments

  • AR-27 · Stair, calculation and check

  • AR-28 · Wall junctions

  • AR-29 · Roof junctions

  • AR-30 · Foundation junctions

CDStructure· 17

  • CD-01 · Foundation plan and concrete pour plan

  • CD-02 · Foundation beam reinforcement and bending schedule

  • CD-03 · Ground floor slab

  • CD-04 · First floor slab

  • CD-05 · Load-bearing walls and lintels

  • CD-06 · Roof structure

  • CD-07 · Structural details

  • CD-08 · Stability

  • CD-09 · Loads and design basis

  • Structural calculationCD-10 · PDF document · A4 · on request
  • CD-11 · Structural quantities

  • CD-12 · Structural inspection plan

  • CD-13 · Formwork and strike times

  • CD-14 · Bar bending schedule

  • CD-15 · Concrete pours and joints

  • CD-16 · Foundation variants and ground slab

  • CD-17 · Slab layout, lintels and bearings

ELElectrical· 9

  • EL-01 · Electrical plan ground floor

  • EL-02 · Electrical plan first floor

  • EL-03 · Consumer unit (single-line diagram), PV, charging point

  • EL-04 · Electrical calculations

  • EL-05 · Earthing and equipotential bonding

  • EL-06 · Cable routes

  • EL-07 · PV, charge point and EMS

  • EL-08 · Electrical materials list

  • EL-09 · Cable journal and phase loads

WRWater & drainage· 7

  • WR-01 · Water and drainage ground floor

  • WR-02 · Water, drainage and rainwater first floor

  • WR-03 · Drainage and rainwater isometric

  • WR-04 · Calculation NEN 1006

  • WR-05 · Bathroom sanitary specification

  • WR-06 · Water and drainage materials list

  • WR-07 · Supply water axonometric

HVHeating & ventilation· 9

  • HV-01 · Heat loss calculation

  • HV-02 · Underfloor heating layout

  • HV-03 · Heat pump and hydraulic diagram

  • HV-04 · Ventilation HRV duct plan

  • HV-05 · Controls

  • HV-06 · Commissioning protocol

  • HV-07 · Installation isometric

  • HV-08 · HVAC materials list

  • HV-09 · Installation details

ENEnergy· 6

  • EN-01 · Thermal envelope

  • EN-02 · BENG indication

  • EN-03 · Daylight

  • EN-04 · Ventilation

  • EN-05 · Acoustics and fire

  • EN-06 · Environmental performance and material passport

CSCost estimate· 9

  • CS-01 · Element estimate

  • CS-02 · Quantity take-off

  • CS-03 · Order lists per phase

  • RFQ packages per subcontractorCS-04 · PDF document · A4 · on request
  • CS-05 · Payment schedule and cash flow

  • CS-06 · Self-build variant

  • CS-07 · Provisional sums and options

  • CS-08 · Cost indicators

  • Cost estimate: summary, quantities, procurement, payments, labour and sourcesCS-20 · PDF document · A4 · on request

CTPlanning & execution· 4

  • CT-01 · Schedule

  • CT-02 · Wkb inspection points

  • CT-03 · Deliveries and lead times

  • CT-04 · Site logistics

BSSpecification· 1

  • SpecificationBS · PDF document · A4 · on request

HBBuild guide· 1

  • Build guideHB · PDF document · A4 · on request

VGPermit & quality assurance· 1

  • Permit and Wkb checklistVG · PDF document · A4 · on request

The package is checked automatically; a specialist has not looked at it. It is an example, not for construction: a permit and the build need the check and signature of an authorised architect.