Skip to content
Service launch: orders are accepted by request
archi.sulerr

Frequently asked questions

If your question isn't here, write to rs@sulerr.com.

What will I get?
A document set for a standard house from the catalogue: drawings, details, calculations, a cost estimate and a schedule. Full pack: 94 documents in 11 sections, Sketch pack: 34. Files: PDF, DXF, XLSX and a 3D model.
Is this the design of my house?
No. It is the set of a standard house from the catalogue — the one shown on the “Sample package” page. We do not adapt it to your plot, dimensions or layout yet. If you need a different house, say so in your request: we will tell you whether we can help.
Can I build or apply for a permit with it?
No. This is a concept-level draft: it was checked automatically, and no specialist has reviewed or signed it. A permit and construction need the review and signature of your own architect and structural engineer.
How long does it take?
A set from the catalogue: 24 hours after we have all the data. We reply to a request within 24 hours.
What does it cost and how do I pay?
Sketch pack — €249, Full pack — €690, excl. VAT. Prices are indicative: we name the final amount in our reply to your request. Payment is by invoice, after you confirm.
In which languages are the documents?
In Dutch and one more language of your choice in the request form: English, Ukrainian.
Where do the prices in the cost estimate come from?
Each price shows its source: a shop and a date, or the mark “expert rate”. It is an estimate with a range, not a contractor’s quotation.
Why is the sample marked DEMO?
The sample is shown reduced in size and marked DEMO so that it is not used instead of a paid set. A paid set has no mark.
Can I get my money back?
EU consumers have a 14-day right of withdrawal (Directive 2011/83/EU), unless performance has begun with their express prior consent. If after delivery it turns out that your building is not among the supported types and we did not warn you about it before payment, you receive a full refund within 14 days. The package is a working draft: before submission it must be checked and signed by your own licensed architect or structural engineer. If, after that, the permit submission fails for a fixable reason within 30 days of delivery, we revise it at no extra cost (and re-sign it if you ordered the signature add-on) or refund the architect sign-off fee. Changes you make yourself after delivery are not covered. For consumers in Ukraine: refund per ЗУ «Про захист прав споживачів».
Who is behind the service?
We publish the operator’s details before paid services start; until then we confirm every offer in writing. Email: rs@sulerr.com.
Do you do renovations, extensions, offices or a custom design?
Not yet. You can still leave a request: we will tell you what we can do and when.
What happens to my data?
Your request and files are stored on our server. To receive or delete your data, write to rs@sulerr.com; deletion no later than 30 days.