Skip to content
Service launch: orders are accepted by request
archi.sulerr

Privacy Policy

Document version: 0.9 (beta) Last review: 2026-11-04

Beta version. Applicable data-protection law: GDPR (NL — AVG, DE — DSGVO, PL — RODO) and, for clients in Ukraine, ЗУ № 2297-VI.

1. Controller

The data controller is identified at /legal/offer. DPO contact: rs@sulerr.com.

2. Data we collect

  • Brief details: plot, building parameters, preferences (technical data).
  • Contact: name, email, optional phone.
  • Account: magic-link auth, session cookie.
  • Usage telemetry: aggregated, no third-party trackers by default.

3. Lawful basis (GDPR Art. 6)

  • Performance of a contract — to deliver the CP and project documentation.
  • Legal obligation — record-keeping for permits and consumer protection.
  • Legitimate interest — service security and abuse prevention.
  • Consent — marketing emails (opt-in only).

4. AI processing

The text of your brief is processed by Anthropic (Claude API) as a sub-processor on our behalf. We do not use your data to train our own models. The model and version are recorded in every document (see /ai-disclosure).

5. Retention

  • Unconverted Level 0 briefs: deleted after 90 days unless you ask us to keep them.
  • Level 2 packages: retained for 7 years.
  • Active project: until completion plus the local statutory archival period.
  • Inactive accounts: 24 months, then anonymised.
  • Logs: 90 days.

6. Your rights

Access, rectification, erasure, portability, objection, withdrawal of consent. Use /lk/data for self-service export and erasure requests.

7. International transfers

EU↔UA transfers under Article 49 GDPR adequacy assessment; full text in the local annex.

8. Complaints

You may complain to the supervisory authority of your habitual residence (NL: AP; DE: BfDI; PL: UODO; UA: Уповноважений ВРУ з прав людини).