How much does it cost to build a 99.9 m² house in the Netherlands? November 2026: 77 positions with sources
Price book of 2026-11-22
This page is built automatically from our price book and the demo calculation of a house; when the price book changes, the figures, sources and dates change with it. Positions priced from shop observations or a rate table are listed with their source and date. The rest of the calculation is an expert range and is marked as such.
Total for the demo house
| Low | Likely | High | |
|---|---|---|---|
| Direct cost | €220,000 | €280,000 | €330,000 |
| Surcharges: overheads 9%, profit and risk 5.5%, contingency 6.9% | |||
| Total excl. VAT | €270,000 | €330,000 | €400,000 |
| VAT 21% | |||
| Total incl. VAT | €330,000 | €400,000 | €480,000 |
Rounded to €10,000. The surcharge rates are an expert assumption (class C) of 2026-11-22. VAT: Wet op de omzetbelasting 1968, art. 9 lid 1, checked on 2026-11-14. Wet op de omzetbelasting 1968, art. 9 lid 1
Calculated with finish level Standard.
The price per m² on the cost page (demo house, usable floor area) and in the configurator (chosen house, gross floor area) is not the same quantity: a different house and a different divisor.
How much of the calculation has sources
84 of 226 resource lines (77 positions) are priced from shop observations or a rate table; they make 36.4% of the direct cost. The other 142 lines carry the expert range of the price book of 2026-11-22 (class C) and make 63.6% of the direct cost. The interval of the calculation (high against low) is 45.6%.
- Class A: shop price: 8.1%
- Class B: rate table or marketplace: 28.4%
- Class C: expert range, no observation: 63.6%
Cost by element
| Element | Quantity | Amount excl. VAT (low / likely / high) | Source and date |
|---|---|---|---|
| Site setup | 1 post | €14,000 / €18,000 / €22,000 | 3.5% from the positions below; the rest is the expert range of the price book, 2026-11-22 |
| Earthworks and excavation | 63.87 m3 | €1,800 / €2,300 / €2,900 | 40.1% from the positions below; the rest is the expert range of the price book, 2026-11-22 |
| Soil survey | 1 post | €2,800 / €3,700 / €4,500 | Expert range of the price book, 2026-11-22 |
| Piles | 252 m | €12,100 / €14,900 / €17,600 | 6.8% from the positions below; the rest is the expert range of the price book, 2026-11-22 |
| Foundation beam | 9.18 m3 | €4,800 / €5,700 / €6,600 | 80.1% from the positions below; the rest is the expert range of the price book, 2026-11-22 |
| Foundation edge insulation | 28.8 m2 | €630 / €810 / €980 | 49.8% from the positions below; the rest is the expert range of the price book, 2026-11-22 |
| Ground floor slab | 56.13 m2 | €3,500 / €4,100 / €4,800 | 60.9% from the positions below; the rest is the expert range of the price book, 2026-11-22 |
| Upper floor slab | 56.13 m2 | €3,100 / €3,700 / €4,400 | 34.8% from the positions below; the rest is the expert range of the price book, 2026-11-22 |
| Floor screed | 99.87 m2 | €2,800 / €3,400 / €4,000 | 59.1% from the positions below; the rest is the expert range of the price book, 2026-11-22 |
| Inner leaf | 177.64 m2 | €8,890 / €8,950 / €9,010 | 100% from the positions below; the rest is the expert range of the price book, 2026-11-22 |
| Cavity insulation | 177.64 m2 | €6,400 / €7,600 / €8,900 | 26.7% from the positions below; the rest is the expert range of the price book, 2026-11-22 |
| Outer leaf (facing brick) | 177.64 m2 | €21,300 / €25,800 / €30,200 | 52.7% from the positions below; the rest is the expert range of the price book, 2026-11-22 |
| Lintels | 18 st | €2,418 / €2,418 / €2,418 | 100% from the positions below; the rest is the expert range of the price book, 2026-11-22 |
| Partition walls | 71.29 m2 | €3,909 / €3,933 / €3,957 | 100% from the positions below; the rest is the expert range of the price book, 2026-11-22 |
| Staircase | 1 st | €4,200 / €5,900 / €7,500 | 8.2% from the positions below; the rest is the expert range of the price book, 2026-11-22 |
| Roof structure | 96.34 m2 | €9,200 / €10,800 / €12,500 | 42.6% from the positions below; the rest is the expert range of the price book, 2026-11-22 |
| Roof covering | 96.34 m2 | €7,300 / €7,800 / €8,500 | 100% from the positions below; the rest is the expert range of the price book, 2026-11-22 |
| Gutters and fascia | 57.41 m | €3,200 / €4,000 / €4,900 | 44.8% from the positions below; the rest is the expert range of the price book, 2026-11-22 |
| Windows and glazing | 35.41 m2 | €22,000 / €26,900 / €31,900 | 15.5% from the positions below; the rest is the expert range of the price book, 2026-11-22 |
| Windows, premium surcharge | 1 post | €5,500 / €7,000 / €8,500 | Expert range of the price book, 2026-11-22 |
| Interior doors | 8 st | €3,000 / €4,000 / €5,000 | 19.1% from the positions below; the rest is the expert range of the price book, 2026-11-22 |
| Wall plaster | 228.03 m2 | €6,950 / €7,040 / €7,250 | 100% from the positions below; the rest is the expert range of the price book, 2026-11-22 |
| Wall tiles | 27.74 m2 | €2,170 / €2,300 / €2,580 | 100% from the positions below; the rest is the expert range of the price book, 2026-11-22 |
| Tiled floors | 49.42 m2 | €3,570 / €3,870 / €4,420 | 100% from the positions below; the rest is the expert range of the price book, 2026-11-22 |
| Ceilings | 99.87 m2 | €1,200 / €1,600 / €2,000 | 69.8% from the positions below; the rest is the expert range of the price book, 2026-11-22 |
| Floor finish, living areas | 42.22 m2 | €1,500 / €2,600 / €3,800 | 31.5% from the positions below; the rest is the expert range of the price book, 2026-11-22 |
| Drainage | 1 post | €4,500 / €5,700 / €7,000 | 21.4% from the positions below; the rest is the expert range of the price book, 2026-11-22 |
| Water supply and sanitary | 1 post | €9,500 / €12,300 / €15,000 | 19.5% from the positions below; the rest is the expert range of the price book, 2026-11-22 |
| Heat pump | 1 st | €11,000 / €13,500 / €16,000 | 14.1% from the positions below; the rest is the expert range of the price book, 2026-11-22 |
| Underfloor heating | 71.67 m2 | €2,780 / €2,870 / €3,440 | 97% from the positions below; the rest is the expert range of the price book, 2026-11-22 |
| Ventilation with heat recovery | 1 st | €6,500 / €8,000 / €9,500 | 19.1% from the positions below; the rest is the expert range of the price book, 2026-11-22 |
| Electrical installation | 1 post | €13,000 / €16,000 / €19,000 | 50% from the positions below; the rest is the expert range of the price book, 2026-11-22 |
| Solar panels (PV) | 12 st | €5,000 / €5,900 / €6,700 | 12.6% from the positions below; the rest is the expert range of the price book, 2026-11-22 |
| EV charging point | 1 st | €1,200 / €1,700 / €2,200 | 14.5% from the positions below; the rest is the expert range of the price book, 2026-11-22 |
| Kitchen | 1 post | €9,000 / €13,500 / €18,000 | Expert range of the price book, 2026-11-22 |
| Landscaping | 1 post | €4,000 / €6,500 / €9,000 | 36.8% from the positions below; the rest is the expert range of the price book, 2026-11-22 |
Positions with sources
Prices per unit exclude VAT. Names of the resources are those of the price book; where a language has no name, English is shown.
| Element | Resource | Quantity | Price per unit (low / likely / high) | Amount (likely) | Source and date |
|---|---|---|---|---|---|
| Site setup | Labourer Class B: rate table or marketplace | 16 h | €39.85 / €39.85 / €39.85 | €638 |
|
| Earthworks and excavation | Labourer Class B: rate table or marketplace | 9.58 h | €39.85 / €39.85 / €39.85 | €382 |
|
| Earthworks and excavation | Fill sand Class A: shop price | 16.77 m3 | €33.04 / €33.04 / €33.04 | €554 |
|
| Piles | Labourer Class B: rate table or marketplace | 25.2 h | €39.85 / €39.85 / €39.85 | €1,004 |
|
| Foundation beam | Carpenter Class B: rate table or marketplace | 27.54 h | €47.70 / €47.70 / €47.70 | €1,314 |
|
| Foundation beam | Concrete worker Class B: rate table or marketplace | 22.95 h | €44.66 / €44.66 / €44.66 | €1,025 |
|
| Foundation beam | Reinforcing steel B500 (cut and bent) Class A: shop price | 1,060.29 kg | €2.08 / €2.09 / €2.10 | €2,217 | 4 observations, 2026-11-14 to 2026-11-14 |
| Foundation edge insulation | Labourer Class B: rate table or marketplace | 10.08 h | €39.85 / €39.85 / €39.85 | €402 |
|
| Ground floor slab | EPS insulation (volume) Class A: shop price | 7.66 m3 | €110.74 / €117.69 / €122.59 | €902 | 5 observations, 2026-11-14 to 2026-11-14 |
| Ground floor slab | Concrete worker Class B: rate table or marketplace | 14.03 h | €44.66 / €44.66 / €44.66 | €627 |
|
| Ground floor slab | Labourer Class B: rate table or marketplace | 16.84 h | €39.85 / €39.85 / €39.85 | €671 |
|
| Ground floor slab | Welded mesh d6 at 150 mm Class A: shop price | 179.44 kg | €1.74 / €1.74 / €1.74 | €312 |
|
| Upper floor slab | Concrete worker Class B: rate table or marketplace | 14.03 h | €44.66 / €44.66 / €44.66 | €627 |
|
| Upper floor slab | Labourer Class B: rate table or marketplace | 16.84 h | €39.85 / €39.85 / €39.85 | €671 |
|
| Floor screed | Finisher (plasterer/tiler) Class B: rate table or marketplace | 44.94 h | €44.66 / €44.66 / €44.66 | €2,007 |
|
| Inner leaf | Thin-bed adhesive for calcium-silicate blocks Class A: shop price | 466.31 kg | €1.24 / €1.37 / €1.49 | €637 | |
| Inner leaf | Calcium-silicate glue block 100 mm (m2 of wall) Class A: shop price | 184.75 m2 | €19.01 / €19.01 / €19.01 | €3,512 |
|
| Inner leaf | Labourer Class B: rate table or marketplace | 35.53 h | €39.85 / €39.85 / €39.85 | €1,416 |
|
| Inner leaf | Mason Class B: rate table or marketplace | 71.06 h | €47.70 / €47.70 / €47.70 | €3,389 |
|
| Cavity insulation | Labourer Class B: rate table or marketplace | 17.76 h | €39.85 / €39.85 / €39.85 | €708 |
|
| Cavity insulation | Mason Class B: rate table or marketplace | 21.32 h | €47.70 / €47.70 / €47.70 | €1,017 |
|
| Cavity insulation | Stainless-steel wall tie Class A: shop price | 731.88 st | €0.40 / €0.43 / €0.51 | €318 | 4 observations, 2026-11-14 to 2026-11-14 |
| Outer leaf (facing brick) | Labourer Class B: rate table or marketplace | 106.58 h | €39.85 / €39.85 / €39.85 | €4,247 |
|
| Outer leaf (facing brick) | Mason Class B: rate table or marketplace | 195.4 h | €47.70 / €47.70 / €47.70 | €9,321 |
|
| Lintels | Labourer Class B: rate table or marketplace | 5.4 h | €39.85 / €39.85 / €39.85 | €215 |
|
| Lintels | Mason Class B: rate table or marketplace | 9 h | €47.70 / €47.70 / €47.70 | €429 |
|
| Lintels | Stainless/steel lintel Class A: shop price | 18 st | €98.51 / €98.51 / €98.51 | €1,773 |
|
| Partition walls | Thin-bed adhesive for calcium-silicate blocks Class A: shop price | 187.14 kg | €1.24 / €1.37 / €1.49 | €255 | |
| Partition walls | Calcium-silicate glue block 100 mm (m2 of wall) Class A: shop price | 74.14 m2 | €19.01 / €19.01 / €19.01 | €1,409 |
|
| Partition walls | Labourer Class B: rate table or marketplace | 14.26 h | €39.85 / €39.85 / €39.85 | €568 |
|
| Partition walls | Mason Class B: rate table or marketplace | 35.65 h | €47.70 / €47.70 / €47.70 | €1,700 |
|
| Staircase | Carpenter Class B: rate table or marketplace | 10 h | €47.70 / €47.70 / €47.70 | €477 |
|
| Roof structure | Carpenter Class B: rate table or marketplace | 57.8 h | €47.70 / €47.70 / €47.70 | €2,757 |
|
| Roof structure | Labourer Class B: rate table or marketplace | 28.9 h | €39.85 / €39.85 / €39.85 | €1,152 |
|
| Roof structure | Structural timber C24 Class A: shop price | 1.25 m3 | €448.65 / €564.79 / €736.68 | €705 | 38 observations, 2026-11-14 to 2026-11-14 |
| Roof covering | Timber batten Class A: shop price | 499.43 m | €0.57 / €0.57 / €0.57 | €285 | 5 observations, 2026-11-14 to 2026-11-14 |
| Roof covering | Labourer Class B: rate table or marketplace | 19.27 h | €39.85 / €39.85 / €39.85 | €768 |
|
| Roof covering | Roofer Class B: rate table or marketplace | 67.44 h | €44.66 / €44.66 / €44.66 | €3,012 |
|
| Roof covering | Ceramic roof tile Class A: shop price | 1,517.36 st | €2.12 / €2.43 / €2.92 | €3,693 | 4 observations, 2026-11-14 to 2026-11-14 |
| Gutters and fascia | Zinc downpipe Class A: shop price | 9.04 m | €9.87 / €11.10 / €12.33 | €100 | |
| Gutters and fascia | Zinc box gutter Class A: shop price | 33.15 m | €15.63 / €15.63 / €15.63 | €518 |
|
| Gutters and fascia | Carpenter Class B: rate table or marketplace | 8.61 h | €47.70 / €47.70 / €47.70 | €411 |
|
| Gutters and fascia | Roofer Class B: rate table or marketplace | 17.22 h | €44.66 / €44.66 / €44.66 | €769 |
|
| Windows and glazing | Carpenter Class B: rate table or marketplace | 63.74 h | €47.70 / €47.70 / €47.70 | €3,040 |
|
| Windows and glazing | Labourer Class B: rate table or marketplace | 28.33 h | €39.85 / €39.85 / €39.85 | €1,129 |
|
| Interior doors | Carpenter Class B: rate table or marketplace | 16 h | €47.70 / €47.70 / €47.70 | €763 |
|
| Wall plaster | Finisher (plasterer/tiler) Class B: rate table or marketplace | 102.61 h | €44.66 / €44.66 / €44.66 | €4,583 |
|
| Wall plaster | Labourer Class B: rate table or marketplace | 22.8 h | €39.85 / €39.85 / €39.85 | €909 |
|
| Wall plaster | Gypsum plaster Class A: shop price | 2,462.72 kg | €0.35 / €0.36 / €0.43 | €894 | |
| Wall plaster | Primer Class A: shop price | 35.92 l | €16.93 / €18.21 / €19.50 | €654 | |
| Wall tiles | Tile adhesive Class A: shop price | 116.51 kg | €0.72 / €0.99 / €1.64 | €115 | 23 observations, 2026-11-14 to 2026-11-14 |
| Wall tiles | Tile grout Class A: shop price | 23.3 kg | €1.73 / €2.35 / €3.29 | €55 | 79 observations, 2026-11-14 to 2026-11-14 |
| Wall tiles | Finisher (plasterer/tiler) Class B: rate table or marketplace | 38.84 h | €44.66 / €44.66 / €44.66 | €1,734 |
|
| Wall tiles | Ceramic tile Class A: shop price | 30.51 m2 | €10.19 / €13.11 / €18.96 | €400 | 20 observations, 2026-11-14 to 2026-11-14 |
| Tiled floors | Tile adhesive Class A: shop price | 259.46 kg | €0.72 / €0.99 / €1.64 | €257 | 23 observations, 2026-11-14 to 2026-11-14 |
| Tiled floors | Tile grout Class A: shop price | 41.51 kg | €1.73 / €2.35 / €3.29 | €98 | 79 observations, 2026-11-14 to 2026-11-14 |
| Tiled floors | Finisher (plasterer/tiler) Class B: rate table or marketplace | 59.3 h | €44.66 / €44.66 / €44.66 | €2,649 |
|
| Tiled floors | Levelling compound Class A: shop price | 155.67 kg | €0.71 / €1.02 / €1.16 | €159 | 5 observations, 2026-11-14 to 2026-11-14 |
| Tiled floors | Ceramic tile Class A: shop price | 54.36 m2 | €10.19 / €13.11 / €18.96 | €713 | 20 observations, 2026-11-14 to 2026-11-14 |
| Ceilings | Finisher (plasterer/tiler) Class B: rate table or marketplace | 24.97 h | €44.66 / €44.66 / €44.66 | €1,115 |
|
| Floor finish, living areas | Finisher (plasterer/tiler) Class B: rate table or marketplace | 16.89 h | €44.66 / €44.66 / €44.66 | €754 |
|
| Floor finish, living areas | Floor underlay Class A: shop price | 44.33 m2 | €1.05 / €1.76 / €2.46 | €78 | |
| Drainage | Labourer Class B: rate table or marketplace | 10.8 h | €39.85 / €39.85 / €39.85 | €430 |
|
| Drainage | Plumber / installer Class B: rate table or marketplace | 16.2 h | €49.27 / €49.27 / €49.27 | €798 |
|
| Water supply and sanitary | Plumber / installer Class B: rate table or marketplace | 48.5 h | €49.27 / €49.27 / €49.27 | €2,390 |
|
| Heat pump | Electrician Class B: rate table or marketplace | 8 h | €49.27 / €49.27 / €49.27 | €394 |
|
| Heat pump | Plumber / installer Class B: rate table or marketplace | 30.5 h | €49.27 / €49.27 / €49.27 | €1,503 |
|
| Underfloor heating | Underfloor heating insulation panel Class A: shop price | 75.25 m2 | €15.59 / €15.59 / €15.59 | €1,173 |
|
| Underfloor heating | Plumber / installer Class B: rate table or marketplace | 25.08 h | €49.27 / €49.27 / €49.27 | €1,236 |
|
| Underfloor heating | Underfloor heating pipe PEX Class A: shop price | 601.65 m | €0.62 / €0.62 / €0.62 | €372 |
|
| Ventilation with heat recovery | Electrician Class B: rate table or marketplace | 4 h | €49.27 / €49.27 / €49.27 | €197 |
|
| Ventilation with heat recovery | Plumber / installer Class B: rate table or marketplace | 27 h | €49.27 / €49.27 / €49.27 | €1,330 |
|
| Electrical installation | Electrician Class B: rate table or marketplace | 162.48 h | €49.27 / €49.27 / €49.27 | €8,006 |
|
| Solar panels (PV) | Electrician Class B: rate table or marketplace | 9.6 h | €49.27 / €49.27 / €49.27 | €473 |
|
| Solar panels (PV) | Roofer Class B: rate table or marketplace | 6 h | €44.66 / €44.66 / €44.66 | €268 |
|
| EV charging point | Electrician Class B: rate table or marketplace | 5 h | €49.27 / €49.27 / €49.27 | €246 |
|
| Landscaping | Labourer Class B: rate table or marketplace | 60 h | €39.85 / €39.85 / €39.85 | €2,391 |
|
This is not an offer
This is the calculation of one demo house of 99.9 m². It is not an offer and not the price of your house: the cost of a house depends on its drawings, the plot and the contractor.
Describe your house