Skip to content
Service launch: orders are accepted by request
archi.sulerr

About us

Document sets for standard houses

We prepare document sets for standard houses from the catalogue: drawings, details, calculations, a cost estimate and a schedule. You see the sample package before you pay and order with a request.

Who stands behind it and what is checked

We work with our own software for design, quantities and cost estimating. The software uses AI, among other things. Every package goes through automatic checks for completeness and consistency before it is sent; it is not reviewed by a specialist. Structural documents remain drafts until a qualified structural designer has signed them off.

Who reviews

Automatic checks: 332 rules. Not reviewed by a specialist.

Where we are

Operator details (company name, registration number, address) are being finalised; until they are published the service runs as a beta and every quote is confirmed in writing. Contact us by email in the meantime.

We reply within 24 hours

Trust and transparency

Who checks

Automatic rules compare the AI draft with the codes and with itself: structure check, banned-claims check and cross-sheet consistency checks. No person reviews the result by hand; a reviewer appears here only when listed in our registry with name and qualification.

Where your data is

Files are stored on our own servers with access logging; no third-party CDN handles personally identifiable information, and no PII is sent to analytics or ad networks.

What we do not do

Does not sign anything. Does not carry professional liability. Does not replace site visits, structural calculation, or municipal consultation. Cannot certify a permit.

Principles

AI prepares drafts, people decide

AI prepares the draft and signs nothing. Automatic rules check it. A permit and construction need the review and signature of your own architect.

One price, named in advance

Prices and lead times come from one catalogue and are the same on every page.

Prices show their source

Each price shows where it comes from: a shop and a date, or the mark “expert rate”.

We say what we cannot do

What is a demo is marked as a demo; what we do not do, we say.

Send a request

Tell us which catalogue house you need. We reply within 24 hours.