← All projects
Project · Built example: full package
Garage, 21.6 m²
Ordering this house is not open yet. View the sample package →
Sheets of this house
AR-13 · Axonometry south-east
AR-02 · Ground floor plan
AR-05 · Elevations north + east
AR-06 · Elevations south + west
Sample sheets marked DEMO. Not for execution.
The project in figures
- Gross floor area
- 21.6 m²
- Storeys
- 1
- Bedrooms
- 0
- Footprint
- 3.6 × 6 m
- Roof
- Pitched
Construction cost
Construction cost range, excl. VAT
Interval: €23,800 to €49,700
A range for the type of building, not an estimate of this project.
What is in the package
The sheets and documents of the built example, by section. Names come from its manifest.
9 of 9 sheets and documents are built; the example is checked automatically and not reviewed by a specialist.
- AR-01Site planA3 · 1:500
- AR-02Ground floor planA3 · 1:50
- AR-04Roof planA3 · 1:100
- AR-05Elevations north + eastA3 · 1:100
- AR-06Elevations south + westA3 · 1:100
- AR-13Axonometry south-eastA4
- AR-14Perspective south-east (schematic)A3
- AR-15Room schedule NEN 2580A4
- AR-16Window and frame scheduleA3
Indicative, not for execution. Structural parts need the confirmation of a structural engineer.